{ "data": [ { "id":"1", "project":"Roadway Paving", "workphase":"Construction / WIP", "desclong":"AP funds will be used to replace deteriorated pavement on campus roads. Present bidding for Nunn to Fountain and Police to Dead End, SU Circle, Campbell Drive.", "building":"Campus", "pm":"Bill Moulton", "progress":"35%", "plannedstart":"Fall 2023", "estimatedcompletion":"Fall 2025", "category":"Asset Preservation", "architect":"N/A", "engineer":"N/A", "contractor":"Len Reglier" }, { "id":"2", "project":"Repl. Of Winter Freeze Damaged Trees", "workphase":"Construction / WIP", "desclong":"Remove and replace damaged trees destroyed by Winter Freeze.", "building":"Campus", "pm":"Bill Moulton", "progress":"5%", "plannedstart":"Fall 2024", "estimatedcompletion":"Spring 2025", "category":"Deferred Maintenance", "architect":"N/A", "engineer":"N/A", "contractor":"TBD" }, { "id":"3", "project":"Replace Nunn Hall Air Handlers", "workphase":"Construction / WIP", "desclong":"Replace Nunn Hall Air Handlers", "building":"Nunn Hall", "pm":"Bob Fox", "progress":"90%", "plannedstart":"Spring 2023", "estimatedcompletion":"Fall 2024", "category":"Deferred Maintenance", "architect":"", "engineer":" ", "contractor":"Daikin" }, { "id":"4", "project":"Fire Alarm Modernization - BC&MP", "workphase":"Construction / WIP", "desclong":"Upgrade Fire Alarm system in MP & BC to all smart devices.", "building":"Math-Education-Psychology/Business Academic Center", "pm":"Bob Fox", "progress":"95%", "plannedstart":"Fall 2022", "estimatedcompletion":"Fall 2024", "category":"Asset Preservation", "architect":"", "engineer":"", "contractor":"Ohio Valley Electric" }, { "id":"5", "project":"Replace HVAC Rooftop Units - MA", "workphase":"Planning", "desclong":"Replace HVAC package rooftop units.", "building":"Mathe-Education-Psychology", "pm":"Bob Fox", "progress":"15%", "plannedstart":"Fall 2022", "estimatedcompletion":"Fall 2024", "category":"Asset Preservation", "architect":"", "engineer":"", "contractor":"Trane" }, { "id":"6", "project":"FA Freight Elevator Modernization", "workphase":"Planning", "desclong":"Modernization of the Fine Arts Freight Elevator.", "building":"Fine Arts", "pm":"Bob Fox", "progress":"10%", "plannedstart":"Spring 2023", "estimatedcompletion":"Spring 2025", "category":"Asset Preservation", "architect":"", "engineer":"", "contractor":"Murphy" }, { "id":"7", "project":"Campbell Hall Return System Upgrade", "workphase":"Planning", "desclong":"Rework HVAC system return to make circulation of air flow and temperature more even throught the Building.", "building":"Campbell Hall", "pm":"Bob Fox", "progress":"25%", "plannedstart":"Fall 2022", "estimatedcompletion":"Fall 2025", "category":"Asset Preservation", "architect":"", "engineer":"", "contractor":"Triton" }, { "id":"8", "project":"KY/Commonwealth Emergency Gen", "workphase":"Planning", "desclong":"Emergency generator has exceeded it's life expectancy.", "building":"Kentucky/Commonwealth Hall", "pm":"Bob Fox", "progress":"25%", "plannedstart":"Fall 2022", "estimatedcompletion":"Fall 2024", "category":"Asset Preservation", "architect":"", "engineer":"", "contractor":"" }, { "id":"9", "project":"Renew/Renovate Steely", "workphase":"Construction / WIP", "desclong":"Includes HVAC upgrades, generator, fire alarm and switchgear replacement.", "building":"Steely Library", "pm":"Bob Fox", "progress":"10%", "plannedstart":"Spring 2022", "estimatedcompletion":"Spring 2026", "category":"Asset Preservation", "architect":"Luminaut", "engineer":"KLH / CMTA", "contractor":"Cummins/Elitaire" }, { "id":"10", "project":"Regents Generator & Switchgear", "workphase":"Construction / WIP", "desclong":"Replace generator and switchgear. Both are at the end of useful life.", "building":"Regents Hall", "pm":"Bob Fox", "progress":"50%", "plannedstart":"Spring 2023", "estimatedcompletion":"Spring 2026", "category":"Asset Preservation", "architect":"", "engineer":"KLH", "contractor":"" }, { "id":"11", "project":"Univ Center Replace Switchgear", "workphase":"Planning", "desclong":"Replace switchgear that is beyond it's usefull life expectancy.", "building":"University Center", "pm":"Bob Fox", "progress":"10%", "plannedstart":"Spring 2023", "estimatedcompletion":"Spring 2026", "category":"Asset Preservation", "architect":"", "engineer":"KLH", "contractor":"Mayers" }, { "id":"12", "project":"Steely Elevator Mod", "workphase":"Design Development", "desclong":"Original passenger elevator is due to be modernized.", "building":"Steely Library", "pm":"Bob Fox", "progress":"5%", "plannedstart":"Spring 2023", "estimatedcompletion":"Fall 2025", "category":"Asset Preservation", "architect":"", "engineer":"", "contractor":"" }, { "id":"13", "project":"KY Hall Transformer", "workphase":"Planning", "desclong":"Replace main building pad mount transformer.", "building":"Kentucky Hall", "pm":"Bob Fox", "progress":"10%", "plannedstart":"Spring 2023", "estimatedcompletion":"Spring 2025", "category":"Asset Preservation", "architect":"", "engineer":"", "contractor":"SECO" }, { "id":"14", "project":"SL Glass Elevator Mod", "workphase":"Substantially Complete", "desclong":"The elevators will be modernized and upgraded to improve safety and performance.", "building":"Steely Library", "pm":"Bob Fox", "progress":"95%", "plannedstart":"Spring 2023", "estimatedcompletion":"Fall 2024", "category":"Asset Preservation", "architect":"", "engineer":"", "contractor":"Murphy" }, { "id":"15", "project":"MP Bldg Childcare Renovation", "workphase":"Construction / WIP", "desclong":"Various minor renovations to childcare space to support new Little Stars childcare. Minor exterior upgrades by O&M (by Work Order).", "building":"Math-Education-Psychology", "pm":"Brenna Cromwell", "progress":"5%", "plannedstart":"Summer 2024", "estimatedcompletion":"Fall 2024", "category":"Deferred Maintenance", "architect":"N/A", "engineer":"N/A", "contractor":"TBD" }, { "id":"16", "project":"Welcome Center Garage", "workphase":"Construction / WIP", "desclong":"Assessment/study to determine the five-year calendar for necessary repairs and maintenance on the Welcome Center Garage.", "building":"Welcome Center Garage", "pm":"Elizabeth Birkenhauer", "progress":"5%", "plannedstart":"Spring 2023", "estimatedcompletion":"Fall 2024", "category":"Deferred Maintenance", "architect":"N/A", "engineer":"THP", "contractor":"TBD" }, { "id":"17", "project":"Nunn Hall Façade Repairs", "workphase":"Construction / WIP", "desclong":"Interior flooring at main campus buildings to be replaced based on assessments of existing conditions that include safety/hazard, deterioration/damage, age or other assessments to be noted.", "building":"Nunn Hall", "pm":"Elizabeth Birkenhauer", "progress":"25%", "plannedstart":"Spring 2023", "estimatedcompletion":"fall 2024", "category":"Asset Preservation", "architect":"N/A", "engineer":"THP", "contractor":"Buckeye" }, { "id":"18", "project":"FA Floor Heaving/Corbett & HVAC", "workphase":"Construction / WIP", "desclong":"Includes repair of floor heaving, HVAC system replacement and fire alarm modernization.", "building":"Fine Arts", "pm":"Elizabeth Birkenhauer", "progress":"35%", "plannedstart":"Fall 2022", "estimatedcompletion":"Fall 2025", "category":"Asset Preservation", "architect":"Luminaut", "engineer":"CMTA, THP, Terracon", "contractor":"Triton" }, { "id":"19", "project":"NH Floor Heaving/RR & HVAC", "workphase":"Construction / WIP", "desclong":"Includes repair of floor heaving, replacement of all restrooms and HVAC upgrades.", "building":"Nunn Hall", "pm":"Elizabeth Birkenhauer", "progress":"35%", "plannedstart":"Fall 2022", "estimatedcompletion":"Fall 2024", "category":"Asset Preservation", "architect":"Luminaut", "engineer":"CMTA, THP, Terracon", "contractor":"Triton" }, { "id":"20", "project":"Nunn Hall Courtroom Renovation", "workphase":"Construction / WIP", "desclong":"Design a new Chase College of Law Moot Courtroom, first floor renovation.", "building":"Nunn Hall", "pm":"Elizabeth Birkenhauer", "progress":"5%", "plannedstart":"Fall 2023", "estimatedcompletion":"Fall 2024", "category":"Deferred Maintenance", "architect":"Luminaut", "engineer":"CMTA, THP, Geotechnology", "contractor":"Triton" }, { "id":"21", "project":"Classroom Furniture & Upgrades FY24", "workphase":"Construction / WIP", "desclong":"A new cost center was created in FY22 from the proceeds from the UK College of Medicine lease. The cost center's funds will be used to pay for classroom furniture and upgrades each year.", "building":"Business Academic Center", "pm":"Kathy Theobald", "progress":"50%", "plannedstart":"Spring 2022", "estimatedcompletion":"Fall 2024", "category":"Deferred Maintenance", "architect":"N/A", "engineer":"N/A", "contractor":"Multiple Vendors" }, { "id":"22", "project":"FY24 Floor Repair", "workphase":"Planning", "desclong":"AP Funds allocated to repair and replace flooring throughout campus.", "building":"Campus", "pm":"Kathy Theobald", "progress":"10%", "plannedstart":"Fall 2023", "estimatedcompletion":"Fall 2024", "category":"Asset Preservation", "architect":"", "engineer":"", "contractor":"Spectra Flooring" }, { "id":"23", "project":"Misc University Center Renovations", "workphase":"Construction Documents", "desclong":"Misc. renovations to UC include upgrades to Budig theater, 2nd floor lobby space,1st floor restrooms, passenger elevator cab and misc. other renovations to upgrade appearance and functionality.", "building":"University Center", "pm":"Kathy Theobald", "progress":"15%", "plannedstart":"Fall 2023", "estimatedcompletion":"Fall 2025", "category":"Asset Preservation", "architect":"Omni", "engineer":"Heapy", "contractor":"TBD" }, { "id":"24", "project":"Herrmann Science Center Expansion", "workphase":"Design Development", "desclong":"Project includes an approximately 78,700 GSF expansion and limited renovations in the existing SC.", "building":"Science Center", "pm":"Mary Paula Schuh", "progress":"5%", "plannedstart":"Spring 2023", "estimatedcompletion":"Fall 2027", "category":"", "architect":"Omni", "engineer":"CMTA/Brown+Kubican/Others", "contractor":"Skanska" }, { "id":"25", "project":"Winter Storm Damage", "workphase":"Construcion / WIP", "desclong":"Various repairs throughout campus as a result of frozen water and sprinkler piping.", "building":"Campus", "pm":"Mary Paula Schuh", "progress":"40%", "plannedstart":"Spring 2023", "estimatedcompletion":"Fall 2024", "category":"", "architect":"Hub + Weber", "engineer":"", "contractor":"CMTA/ Trade 31/ Kalkreuth" }, { "id":"26", "project":"Civic Center Renovation", "workphase":"Planning", "desclong":"Renovation of the former HHTs Civic Center for the NKY Medical Examiner and NKY Crime Lab offices.", "building":"Civic Center", "pm":"Mary Paula Schuh", "progress":"10%", "plannedstart":"Spring 2023", "estimatedcompletion":"Fall 2025", "category":"Asset Preservation", "architect":"Luminaut/Crime Lab Design", "engineer":"CMTA/Crime Lab Design", "contractor":"TBD" }, { "id":"27", "project":"Grant County Campus Renovation", "workphase":"Bidding Process", "desclong":"Renovation of multiple spaces in the Grant Countybuilding to support the establishment of a nursing program in that county.", "building":"Campus", "pm":"Mary Paula Schuh", "progress":"15%", "plannedstart":"Spring 2023", "estimatedcompletion":"Fall 2024", "category":"", "architect":"N/A", "engineer":"N/A", "contractor":"TBD" }, { "id":"28", "project":"NH Roof Restoration", "workphase":"Planning", "desclong":"Repairing the existing roof membrane, appling new top coat of waterproofing and replacing the gravel surface.", "building":"Nunn Hall", "pm":"Paul Hundemer", "progress":"5%", "plannedstart":"Spring 2023", "estimatedcompletion":"Fall 2024", "category":"Asset Preservation", "architect":"", "engineer":"", "contractor":"Tremco" }, { "id":"29", "project":"Underground Water Valves", "workphase":"Construction / WIP", "desclong":"Replace 12 Water (isolation) Valves withing the campus water distribution system. ", "building":"Campus", "pm":"Paul Hundemer", "progress":"85%", "plannedstart":"Spring 2023", "estimatedcompletion":"Fall 2024", "category":"Asset Preservation", "architect":"", "engineer":"", "contractor":"Schmidt Plumbing" }, { "id":"30", "project":"Replace Steel Gas Lines", "workphase":"Construction / WIP", "desclong":"Relpacing outdated steel gas lines.", "building":"Campus", "pm":"Paul Hundemer", "progress":"30%", "plannedstart":"Spring 2023", "estimatedcompletion":"Fall 2024", "category":"Asset Preservation", "architect":"TBD", "engineer":"TBD", "contractor":"Russmar Utility Management" }, { "id":"31", "project":"Lake Infrastructure Repairs", "workphase":"Bidding Process", "desclong":"This project will repair a major leak that is undermining the footings and retaining walls of the upper lake. Also, this project will repair or replace the pumps that create the water fall. ", "building":"Campus", "pm":"Paul Hundemer", "progress":"50%", "plannedstart":"Fall 2023", "estimatedcompletion":"Fall 2024", "category":"Asset Preservation", "architect":"", "engineer":"", "contractor":"TBD" }, { "id":"32", "project":"Campbell Hall Roof Restoration", "workphase":"Planning", "desclong":"Campbell Hall Roof Restoration", "building":"Campbell Hall", "pm":"Paul Hundemer", "progress":"50%", "plannedstart":"Fall 2023", "estimatedcompletion":"Fall 2024", "category":"Asset Preservation", "architect":"", "engineer":"", "contractor":"Tremco" }, { "id":"33", "project":"Campus Concrete Projects", "workphase":"Construction / WIP", "desclong":"Project includes a façade condition assessment & design/implementation of, as needed.", "building":"Campus", "pm":"Rodney Thiemann", "progress":"85%", "plannedstart":"Spring 2023", "estimatedcompletion":"Fall 2024", "category":"Asset Preservation", "architect":"", "engineer":"THP", "contractor":"Tumlin" }, { "id":"34", "project":"2024 Roadway Sidewalk Lighting", "workphase":"Construction / WIP", "desclong":"Convert additional areas of campus with older steel poles with metal halide (HID) lighting to energy efficient LED.", "building":"Campus", "pm":"Rodney Thiemann", "progress":"5%", "plannedstart":"Spring 2023", "estimatedcompletion":"Fall 2024", "category":"Asset Preservation", "architect":"", "engineer":"", "contractor":"Atkins & Stang" }, { "id":"35", "project":"AC Plumbing infrastructure Repl", "workphase":"Planning", "desclong":"The vertical plumbing infrastructure and all restroom finishes will be replaced.", "building":"Administrative Center", "pm":"Rodney Thiemann", "progress":"5%", "plannedstart":"Fall 2023", "estimatedcompletion":"Fall 2025", "category":"Asset Preservation", "architect":"Luminaut", "engineer":"CMTA", "contractor":"TBD" } ] }